Stromeferry bypass weekly updates
Downloads associated with the weekly updates for Phase 10
-
Nightworking 5 October 2018
File type: JPG
Size: 2.77 MB
-
Rock anchors being installed 17 October 2018
File type: JPG
Size: 2.63 MB
-
Drill mounted on telehandler 11 October 2018
File type: JPG
Size: 2.92 MB
-
Train halt 22 October 2018
File type: JPG
Size: 2.83 MB
-
Hoisting up the active netting 31 October 2018
File type: JPG
Size: 5.73 MB
-
Active rock netting system being contoured to the rock face 7 November 2018
File type: JPG
Size: 5.7 MB
-
Active netting system in place on the rock face 13 November 2018
File type: JPG
Size: 5.57 MB