Agendas, reports and minutes
North Planning Applications Committee
Date: Monday, 9 September 2013
Meeting Downloads
- Site Visit Route Downloads, 612.47 KB
- PLN07913 Part 1 Construction of a wind farm containing 15 (as amended) wind turbines, crane hardstandings, site accesses from the A9(T) Downloads, 1.64 MB
- PLN07913 Part 2 Construction of a wind farm containing 15 (as amended) wind turbines, crane hardstandings, site accesses from the A9(T) Downloads, 953.98 KB
- PLN08013 Part 1 12/02868/FUL: Bad a Cheo Wind Farm, RWE Npower Renewables Ltd Downloads, 1.3 MB
- PLN08013 Part 2 12/02868/FUL: Bad a Cheo Wind Farm, RWE Npower Renewables Ltd Downloads, 1.26 MB
- PLN08013 Part 3 12/02868/FUL: Bad a Cheo Wind Farm, RWE Npower Renewables Ltd Downloads, 1.01 MB
- PLN08113 Part 1 Whirlwind Renewables West of Mybster Farm, Spittal, Watten, Caithness (Achlachan Wind Farm) Downloads, 1.54 MB
- PLN08113 Part 2 Achlachan Wind Farm map Downloads, 1.15 MB
- PLN07513 Part 1 2 Mr Jeffery Bannerman Land 240M SE Of Balmore Farm, Dounreay Downloads, 1.77 MB
- PLN07513 Part 2 piping and earthing plan Downloads, 413.3 KB